Friday 18 March 2016

CONSTRUCTION - 18.03.2016 Tiling Check DONE

We are now moved on to STEP 5: LININGS, KITCHENS & TILING in MJH's 8 steps. (MJH - 8 steps), next step is PRACTICAL COMPLETION!

We had the second last inspection with our Site Supervisor (SS) on Friday, 18th Mar 2016. Waterproofing, internal doors, kitchen cabinets and bathroom vanities are all completed.

Our SS check the tiles with us, as well as how the tiles are going to be laid. Tiling commenced on the same day, and painting will start after Easter break.


Internal doors - Danish style (upgrade)



 -  Ensuite shower

- Vanity - 3 drawers (upgrade)

- Main bathroom


- Bathroom tiles ( wall - white, floor - grey)

- Kitchen (fridge cabinets, pantry, wall cabinets (lip, no handle), pot drawers, etc.

- Kitchen island