We had an official inspection with the site supervisor the week before Christmas and were told our windows wouldn't be finished by the factory before the holiday. Then MJH was off for Christmas and back on 11.01.2016.
We go to the site every weekend to track the progress. Our windows have been installed and bricks have been delivered by Saturday, 16th Jan 2016.