Ganilton's Hamilton

Building the Hamilton Three with McDonald Jones Homes

Monday, 16 May 2016

CONSTRUCTION - 16.05.2016 PCI DONE

›
PCI!!!!! We cannot believe that 1 year after putting the deposit down on the H&L package, we are so close to the finish line! Alt...

CONSTRUCTION - 16.04.2016 One month later..

›
One month later.... Other than the 2-week delay on the floorings, everything else was moving fast. Driveway was ready to be poured ...
Friday, 18 March 2016

CONSTRUCTION - 18.03.2016 Tiling Check DONE

›
We are now moved on to STEP 5: LININGS, KITCHENS & TILING in MJH's 8 steps. ( MJH - 8 steps ), next step is PRACTICAL COMPLETION! ...

CONSTRUCTION - 11.03.2016 LOCK UP

›
Electrical and pipes went in after roof was done, which was a quick job. Then it took around 2 weeks to put on the walls (and filling the ...

CONSTRUCTION - 21.02.2016 Electrical DONE

›
During electrical walk through, our Site Supervisor check every single item on the list with us. All electrical items (light, power points, ...
Saturday, 13 February 2016

CONSTRUCTION - 08.02.2016 Roof DONE

›
Roof only took 2 days. This is how Austral Engage brick and Colourbond Windspray roof look like in the dark and in the sun.

CONSTRUCTION - 04.02.2016 Brickwork DONE

›
Brick is done. Only took 9 business days. It looks pretty straight from the sides. However, I did found the lines around the windows are ...
›