CONSTRUCTION - 16.04.2016 One month later..


One month later....

Other than the 2-week delay on the floorings, everything else was moving fast.
Driveway was ready to be poured and painting was done inside and out - kinda.. (they missed to paint the pillars)



We were only able to see inside through the windows. It looked like all tap wares, shelving and electrical were completed already.

Kitchen splash back (detroit grey) had just been installed. It looked less green than I expected - thumbs up. All cabinets are in matt white colour (hides the fingerprints and grease; no reflections). Our ceasarstone benchtop is 20mm white shimmer which has little bling bling effects, no waterfall. Taps (water and filtered water) and double bowl undermount sink are from impression upgrades.

Wall colour is stonebridge, I'll post clearer photos in the PCI update.