Building the Hamilton Three with McDonald Jones Homes
Friday, 18 March 2016
CONSTRUCTION - 21.02.2016 Electrical DONE
During electrical walk through, our Site Supervisor check every single item on the list with us. All electrical items (light, power points, phone line, etc) were marked on the floor.